Typical sequence
Most kits start with the floor panel, then rear and side walls, front or door panel, bench and heater connections, roof, and trim. Sequence varies. Following a similar-looking video instead of the exact model manual can hide connector and panel differences.
Plan for weight and geometry
Panels can be tall, top-heavy, and glass-heavy. Confirm stairs and corners before unboxing downstairs. Leave working space around the footprint so helpers can engage buckles and lower the roof safely.
Do not force electrical connectors
Match labels, inspect pins, align plugs fully, and keep wiring out of panel joints. If the control panel or a heater does not work, power down and recheck accessible connections before assuming a failed component.
Sources and documentation
Specifications, claims, and installation requirements can change. Confirm the current manufacturer manual for the exact model and variant.